2 Gallons
Showing all 6 results
-
3246 Polyurea Flexible Expansion Joint Filler | Quick Cure | Exterior Interior | Low Temp -20°F | Elongation 600%+
- Quick set with "Drive-Over" in 30 to 45 minutes
- High Density Polyurea
- Very Flexible with Elongation ASTM D124 >600%
- Meets USDA Requirements for intermittent contact
- Meets FAA P605 – for airfield joints
-
830 Fast Set Polyurea Repair | Joint Sealant | Caulk | Adhesive | No Sag Walls | Concrete | Steel | Wood
- Vertical hold directly from the cartridge or static mixer
- Can be sprayed over with polyurea in a short time
- High chemical resistance, fuel resistant,
- Highly adhesive to many substrates
- Cold weather application down to -20F
-
PerfectPaint Floating Floor Prep | Seal-Prime-Paint One Step | Asbestos Tile, Mastic, Glue, Cement | VCT, Ceramic Tile, Linoleum, Wood
- SEAL - PRIME - PAINT all in one step wide range of dangerous and difficult flooring materials: asbestos, lead, mastics, glue, cements without need for expensive removal
- Great bonding to smooth, non-porous surfaces found in commercial offices and homes including VCT, ceramic tile, vinyl, linoleum
- Safely encapsulate, rather than grind asbestos and lead prior to application of vinyl, tile, wood or other resilient flooring
- Reduce surface prep, expense and project completion time
- No need for scraping, grinding, solvents, soy gels, or removal of mastics
-
PerfectPrimer Sealer | Encapsulate Asbestos Tiles , Mastics, Glues, Cements | VCT, Vinyl, Linoleum, Wood
- SEAL and PRIME and ENCAPSULATE wide range of dangerous and difficult flooring materials: asbestos, lead, mastics, glue, cements without need for expensive removal
- Great bonding primer for smooth, non-porous surfaces found in commercial offices and homes including VCT, ceramic tile, vinyl, linoleum
- Safely encapsulate, rather than grind asbestos and lead prior to application of coating, paint or resilient flooring
- Molecular adhesion ensures a strong bond to difficult non-porous surface
- Reduce surface prep, expense and project completion time






