conc
No products in the cart.
Return To ShopFree shipping Lower 48 States
$600.00
6007 Wet Condition Epoxy For Concrete & Steel | Low Temp 35°F
MV2112 Moisture Vapor Barrier Primer Epoxy For Concrete Floors | ASTM F3010
conc
P3 Industrial offers exceptional concrete waterproof protection with zero voc. With a simple one time spray application P3 Industrial will permanently waterproof bare concrete exterior or interior, floor or wall. In addition P3 Industrial will significantly improve resistance to freeze / thaw and spalling damage as well as protection against salt intrusion in winter weather.
Using colloidal silica nano-technology, P3 Industrial provides a permanent increase in the waterproofing, durability and lifespan of Portland cement concrete. P3 Industrial protects the concrete throughout the treated area without forming a membrane. With its deep penetration of at least 1.5″ to 2″ or more, treated concrete better resists deterioration from biological and environmental attack offering improved resistance to impacts from salts, waste, efflorescence and carbonation.
P3 Industrial penetrates into the accessible capillary system, reacting with the available free alkali found within, and primarily forming calcium silicate hydrate (C-S-H).This action waterproofs the matrix of the concrete. Waterproofing the matrix is one of the leading reasons P3 Industrial is specified. Roofs, parking decks, subterranean basement walls, tanks and sewage structures are all examples of successful P3 Industrial Waterproofing Applications.
Utilizing nano-technology, P3 Industrial has the ability to withstand a minimum of 75lbs of Hydrostatic Vapor Pressure. P3 Industrial can be used as the choice for curing and protection on fresh concrete, to treat existing clean, hardened, permeable concrete. P3 Industrial is designed for unpainted and unsealed cast in place, pre-cast, shotcrete, gunite and poured concrete projects.
P3 Industrial can be used to treat and condition concrete that will receive epoxy, polyaspartic, polyurea and breathable coatings or industrial paints. On new concrete, coverings and coatings can be installed in as little as 14 days after treatment without concern for future moisture related failure. Used correctly, the P3 Industrial may improve the bond strength of coatings as much as 73%.
P3 Industrial comes in a 5 gallon pail, ready to use. Can be applied in both moist and wet concrete conditions as long as no standing water up to 100% RH, ok to apply. Important to do a water absorption test before applying to make sure concrete is porous enough to accept P3 Industrial. See Application instructions. Comes with 15 year Performance Warranty against moisture.
Note: P3 Industrial is not recommended for concrete block and concrete paver applications.
Topcoat: None Required. On existing concrete, can apply any 2 part high performance coating or paint 24 hours after application of P3 Industrial. When P3 Industrial is applied to newly poured concrete within 24 hours of the pour, can apply any 2 part coating or paint after only 14 days.
Concrete: One coat 200 Square Feet Per Gallon
Shotcrete: One coat 160 Square Feet Per Gallon
Specs/Test Data | |
Vapor and Head Pressure Resistance | Minimum 75 psi+ |
ASTM C1556 Bulk Chloride Diffusion | 48% (Typical Improvement) |
ASTM C666 Freeze/Thaw | 49% (Typical Improvement) |
ASTM C1803 Abrasion Resistance (Dusting) | 50% (Typical Improvement) |
ASTM E96 Water Vapor Transmission | 81% (Typical Improvement) |
ASTM C39 Compressive Strength (28-Day) | Up to 20% (Typical Improvement) |
ASTM C157 Drying Shrinkage (28-Day) | Up to 60% (Typical Improvement) |
EN 12390-8 Depth of Hydrostatic Penetration | 97% (Typical Improvement |
Flammability | 0 (non-flammable) |
VOC/VOS Content | 0.0 g/ml |
Color | Translucent White |
pH | 11.5+/- |
Shelf Life | 5 years when stored in original container 50F-80F |
RECOMMENDED EQUIPMENT FOR APPLICATIONS
Important: When using an airless sprayer on freshly placed concrete, be sure to adjust pressure settings so that no surface damage occurs. The use of centrifugal pumps is not recommended.
Use a low to medium pressure sprayer complete with an extension wand and fan tip spray size of 0.019-0.021 inches (0.48-0.53 mm) for vertical or overhead applications and fan tip spray size of 0.024-0.031 inches (0.61-0.79 mm) for flatwork applications.
Alternate spray system: Use an agricultural sprayer using an approximate 5 gallons per minute (18.93 liters per minute) diaphragm pump and fan tip spray size of 0.30-0.60 gallons per minute (1.14-2.27 liters per minute) for vertical or overhead applications and fan tip spray size of 0.50-1.0 gallons per minute (1.89-3.79 liters per minute) for flatwork applications.
A backpack or Hudson hand pump garden type sprayer should be used if only applying one bucket or fewer of material.
RECOMMENDED APPLICATION METHOD
Important: Spray in a 50% overlapping pattern.
For slab applications, hold wand perpendicular to the surface and spray 6 inches (15 cm) from the surface. Apply product using the prescribed application rate for the area. If pooling or dry areas are observed while applying, use a broom to distribute material so that the product remains uniform throughout the application area. Do not allow excess material to dry on the slab. Remove excess P3 Protect product with a foam squeegee, broom, wet vac, or mop.
Note: Product not removed from the slab may become slippery in a wet condition.
Treated area can be opened to foot traffic one hour after treatment and all heavy equipment traffic 24 hours after treatment.
For vertical and overhead applications, hold sprayer wand perpendicular to the surface and spray 6 inches (15 cm) from the surface. Very light and repeated spray passes should be made over the same area using the prescribed application rate. For vertical application, begin at the bottom and go to the top.
The concrete surface needs to be structurally sound. If there are any concerns, consult with an engineer on the project or consult with a structural engineer. Any weak or degraded concrete surface or concrete exhibiting signs of scaling, delamination, or spalling must be mechanically removed to achieve a solid substrate. The concrete should be free of contaminants such as dirt, wax, oil, grease, curing compounds, adhesives, paint, or any other material that could prohibit P3 Industrial from entering the concrete matrix. Always perform a water absorption test to determine if the product will be able to penetrate into the concrete surface.
After application of P3 Industrial wait a minimum of 24 hours after application to apply a topcoat. Before applying a coating make sure no residual P3 Industrial remains on the surface which can happen when it has been overapplied. In rare cases P3 can also purge salts in the concrete to the surface which should be removed before coating over it. If necessary, simply rinse the surface and as required in conjunction with a mild cleaning agent.
On existing concrete, always perform a water absorption test to determine if P3 Industrial will be able to penetrate into the concrete surface. There are standards that describe a method for testing water absorption, such as ASTM F3191. An alternative would be to outline a penny with a pencil and place 5 drops of water inside the marked outline. Monitor the water to see if the water is penetrating into the concrete or moving outside the outline. After two (2) minutes, the water should be absorbed into the concrete without having any bubbling or sheen when viewing the area. The contractor is responsible for choosing the test method and quantity of testing.
Time of Placement
P3 Industrial can be used at the time of placement. Application should be performed after final troweling has been completed and concrete can take foot traffic without damage. Final concrete finish must be unburnished prior to application.
If you want to apply a coating or paint product over newly poured concrete in less than the normal 30 days wait time (as soon as 14 days), P3 Industrial should be applied to the concrete within 24 hours of a new pour for horizontal projects and within 8 hours of form removal for vertical concrete projects.
Concrete Finish
The concrete surface finish is a key part of the P3 Industrial application process. The surface finish should be discussed with the concrete foreman and the superintendent prior to concrete placement. The surface, if hard troweled, should be finished in an open fashion (unburnished), avoiding a burnished or black surface finish. P3 Industrial needs a porous (open-matte) finish to penetrate into the concrete and perform as intended. SCP recommends observing the concrete finishers during the finishing process to ensure the concrete is not burnished.
P3 Protect can be applied to hand finished surfaces, broom finished surfaces, and bull floated surfaces.
Note: Extra time may need to be allowed for concrete to set on broom finished surfaces to ensure no damage to concrete from foot traffic
Accelerators
Accelerators are often used during colder months to accelerate the setting of the concrete. These admixtures will also accelerate the action of P3 Industrial. If these admixtures are used (check batch tickets), applicators should test a small area prior to a full application. Tests should be conducted periodically. A test section measuring approximately 3 ft x 3 ft (0.914 m to 0.914 m) is recommended. Apply P3 Industrial product to this area and wait 15 minutes. If the P3 Industrial product begins to appear milky and turns into a gel or feels very slippery, then the accelerator is still active. Re-test until the product remains unchanged from its normal consistency. Once P3 Industrial remains unchanged on a test area for a minimum of 15 minutes, full application can begin.
Admixtures
The use of moisture vapor reducing admixtures (MVRA), integral waterproofing admixtures, or latex admixtures should not be used when utilizing P3 Industrial spray-applied technology.
Topically Applied Concrete Products
There are many concrete additives on the market. Some of these will work in conjunction with P3 Industrial, some will not.
If a monomolecular evaporation retarder (MMER) is used on the concrete, the MMER should be applied in accordance with the manufacturer’s recommendations.
When specified, curing compounds (ASTM C309 or ASTM C1315 products) can be used but should only be used after the P3 Industrial product application. If a curing compound is used prior to the P3 Protect product application, remove the curing compound prior to treatment.
ENVIRONMENTAL CONDITIONS
Hot Weather: One of the challenges of hot weather applications is rapid evaporation and unwanted gelling. SCP recommends pre-wetting concrete when surface temperature is above 90°F (32.2°C). Pre-wetting consists of spraying a light coat of water directly in front of P3 Industrial product application. This process helps in preventing rapid evaporation of P3 Protect from the surface of the slab, allowing for better penetration into the hot concrete. P3 Protect should be removed before allowing to dry on the slab.
Cold Weather: Challenges faced during cold weather applications include low temperature application, accelerator addition, and shorter days. The minimum air and concrete temperature at which P3 Industrial can be applied is 35°F (1.7°C) and rising. If an accelerator is used in the concrete mix, test a small area as described in the Accelerators section of this document. With shorter days during the winter months, longer set times could push P3 Protect application to a later time when temperatures are too cold. Application may need to take place the following morning. If this is the case, the concrete company may need to protect the concrete with blankets or other means.
Rain Event: A rain event is defined as liquid precipitation that is sufficient enough to cause standing water on the concrete structure. If a light mist is observed that causes no standing water, this is not considered a rain event and application does not require interruption.
If a rain event begins during an application, the portion of the slab that has been treated and squeegeed off is considered treated. If a portion of the slab is being treated and not squeegeed when it rains, P3 Industrial will need to be reapplied after rain the has stopped. Mark the area last treated so that you have a reference on where to resume application after the rain event. After rain has stopped, the slab should be squeegeed to remove all standing water. Application can continue as normal, beginning after the last treated section of the slab.
POST APPLICATION
Traffic: Foot traffic is allowed one hour after application. Equipment traffic is allowed after 24 hours or when the design professional decides the concrete is strong enough to handle the load.
Control Joints: EPC requests that control joints are cut after P3 Industrial has been applied. If the control joints are cut prior to the placement of P3 Protect, the area will need to be cleaned to remove the residue dust from the cutting. P3 Industrial can react with the dust creating a slick surface.
Notes
– New concrete: please follow all procedures required by product manufacturer.
– Existing concrete: wait a minimum of 3 days
Packaging/Storage
P3 Industrial is packaged in 5, 55, and 275 gallons. Product shall ideally be stored in a location that is dry and between 35°-100°F (2°-38°C) ambient temperature. Optimal storage is at the middle of the temperature range. Protect from freezing and direct sunlight. 5-year shelf life under proper storage conditions.
General Information
For safe handling information on this product, see the Safety Data Sheet (SDS).
NOTICE TO BUYER: DISCLAIMER OF WARRANTIES AND LIMITATIONS ON OUR LIABILITY We warrant that our products are manufactured to strict quality assurance specifications and that the information supplied by us is accurate to the best of our knowledge. Such information supplied about our products is not a representation or a warranty. It is supplied on the condition that you shall make your own tests to determine the suitability of our product for your particular purpose. Any use or application other than recommended herein is the sole responsibility of the user. Listed physical properties are typical and should not be construed as specifications. NO WARRANTY IS MADE, EXPRESSED OR IMPLIED, REGARDING SUCH OTHER INFORMATION, THE DATA ON WHICH IT IS BASED, OR THE RESULTS YOU WILL OBTAIN FROM ITS USE. N0 WARRANTY IS MADE, EXPRESSED OR IMPLIED, THAT OUR PRODUCT SHALL BE MERCHANTABLE OR THAT OUR PRODUCT SHALL BE FIT FOR ANY PARTICULAR PURPOSE. NO WARRANTY IS MADE THAT THE USE OF SUCH INFORMATION OR OUR PRODUCT WILL NOT INFRINGE UPON ANY PATENT. We shall have no liability for incidental or consequential damages, direct or indirect. Our liability is limited to the net selling price of our product or the replacement of our product, at our option. Acceptance of delivery of our product means that you have accepted the terms of this warranty whether or not purchase orders or other documents state terms that vary from this warranty. No representative is authorized to make any representation or warranty or assume any other liability on our behalf with any sale of our products. Our products contain chemicals that may CAUSE SERIOUS PHYSICAL INJURY. BEFORE USING, READ THE MATERIAL SAFETY DATA SHEET AND FOLLOW ALL PRECAUTIONS TO PREVENT BODILY HARM.
$120.00 – $600.00
$700.00
Weight | N/A |
---|---|
Dimensions | N/A |
Size | |
Product Material | |
Surface Applied To | |
Color | |
Manufacturer | |
Recoat Time | 1 to 4 hours |
Function | Primer |
Weight | N/A |
---|---|
Dimensions | N/A |
Weight | 165 lbs |
---|---|
Dimensions | N/A |
Size |
Weight | N/A |
---|---|
Color | Alpine Seal, Bison Brown, Charcoal, Dark Oak, Driftwood, Evergreen, Mountain Pine, Rustic Cedar, Sedona, Whitewash |
Size |
Copyright 2024 by Exterior Performance Coatings LLC